DALLAS ISD - ORG 042 - JUDGE LOUIS A. BEDFORD, JR. LAW ACADEMY
Status
Bidding Closed
Prebid Date | 10/24/22 10:00am |
Bid Date | 11/15/22 2:00pm |
Company & Contacts
Location
Dallas, Texas
All digital files included with purchase of complete printed set via file transfer. Specs seperated by section and plans by sheet names.
Half Size Available upon Request
NOTICE: INVITATION TO BID
SCOPE OF WORK:
ORG 042– Judge Louis A. Bedford Jr. Law Academy – Project consists of the following:
1. Approximately 157,000 sf of New Construction and all associated items related to new construction
and demolition of an existing school. Including but not limited to:
a. Demolition/abatement
b. Site work and utilities
c. Grading and paving
d. Landscaping
e. Structural Concrete
f. ICF
g. Steel framing
h. Roofing
i. Interior finishes
j. Theatrical Lighting rigging and AV Equipment
k. Gymnasium equipment
l. Work associated with an ICC-500 tornado shelter
m. Exterior masonry and metal panels
BUDGET:
$ 58,028,240.00
PRE-BID DATE AND LOCATION:
A pre-proposal meeting will be held at 10:00 AM on Monday, October 24, 2022 via Zoom Conference Call for all interested parties. This meeting is not mandatory, but information discussed will be extremely helpful in preparation of the proposal.
Join Zoom Meeting:
https://dallasisd.zoom.us/j/81556617845?pwd=QUFabkFyM2pXakljMDQrQXpNcjdWdz09
Meeting ID: 815 5661 7845
Passcode:246013
BID-DATE & LOCATION:
Completed CSP Package Part 1-A, 1-B and 1-C are due on Tuesday, November 15, 2022 at 2:00 PM (local time).
Completed CSP Package Part 2 is due on Wednesday, November 16, 2022 at 3:00 PM (local time).
Any materials received after the respective closing dates / times will not be considered.
OWNER
Dallas ISD Procurement Services c/o Bond/Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 North Central Expressway, Suite 800
Dallas, TX 75231
OWNER’S PROJECT MANAGER (PM)
Dikita Enterprises, Inc. will be the Owner’s Project Manager (PM) for the management of planning, design, permitting, construction, and post-construction for this CSP. All correspondence
and communication during the contract finalization, construction and post-construction processes
shall be directed to the Architect/Engineer firm (A/E) with copy to Dikita Enterprises, Inc. During
construction, the PM shall have authority to act on behalf of Dallas ISD for Owner related
direction.
Sultan Cole Sr., Project Manager
Dallas Independent School District
Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway Suite 800
Dallas, TX 75231
Phone: (972) 925-7259
E-mail: C96754@dallasisd.org
ARCHITECT
WRA Architects, Inc.
12377 Merit Dr. Suite 1800 Dallas TX 75082
Main Contact: Seth Stevens, AIA, NCARB
Phone: 214-750-0077
Email: sstevens@wraarchitects.com
BID METHOD:
Competitive Sealed Proposals