DALLAS ISD - ORG 055 THOMAS J. RUSK MIDDLE SCHOOL - RENOVATION
Status
Bidding Closed
Prebid Date | 8/19/24 4:00pm |
Bid Date | 9/11/24 2:00pm |
Company & Contacts
Location
2929 Inwood Road Dallas, TX 75235
All digital files included with purchase of complete printed set via file transfer. Specs separated by section and plans by sheet names.
Half Size Available upon Request
NOTICE: INVITATION TO BID
Scope of Work. The Work consists of:
ORG 055 - Thomas J. Rusk Middle School
1. Replace exterior waterproofing / sealant joints (include all exterior wall control / expansion
joints, material transitions, around door & window frames, wall penetrations, etc).
2. Paint all previously painted exterior surfaces & power wash as required. Provide new
landscaping & sidewalk replacement as required..
3. Replace 2-ply modified bitumen roof system.
4. Perform mild detergent medium pressure wash on stained or mildwed facade.
5. Replace outdated exterior windows with new energy efficient window assembly per DISTRICT
STANDARDS.
6. Replace educational casework in all classrooms (excluding science labs) per DISTRICT
STANDARDS. (Include
7. Replace teaching surfaces (marker boards, tack boards, etc) at each classroom.
8. Replace carpet / vinyl composite tile (VCT) and base throughout facility excluding all main
corridors, auditorium, and athletic areas. (Include ACM abatement where applicable & except
at areas of renovation).
9. Paint all previously painted interior surfaces. Repair / patch walls prior to paint (except at areas
of renovation).
10. Remove & replace cracked concrete sidewalk.
11. Replace rooftop DX units.
12. Replace split system AC units.
13. Replace chilled water pumps.
14. Replace exhaust fans.
15. Provide DDC controls.
16. Replace lined ductwork.
17. Provide VFD on chilled water pumps.
18. Replace fan coil units.
19. Provide washer/dryer connections.
20. Provide hose bibbs.
21. Replace grease waste piping.
22. Replace waste piping.
23. Provide / replace IDF/MDF air conditioning.
24. Replace fire alarm system.
25. Provide exterior lighting controls.
26. Replace exterior lights with LED lighting.
27. Provide secure front vestibule.
28. Provide intercom system.
29. Provide new marquee sign located at front entry per DISTRICT STANDARDS.
30. Provide new way-finding site signage.
31. Provide new room graphics and way-finding signage.
32. Replace air handling units
33. Replace Kitchen hood and exhaust
34. Replacing condensing boiler
BUDGET:
PRE-BID & LOCATION:
A pre-proposal meeting will be held at Thomas J. Rusk Middle School on 08/19/2024 at 4:00PM for all
interested parties. This meeting is not mandatory, but information discussed will be extremely helpful in
preparation of the proposal.
All general contractors and sub-contractors are encouraged to attend this meeting. Contractors will meet A/E(s) and
PM at the school to start site tours. The first site tour will take place immediately following the pre-proposal. The
following is the schedule for each site tour:
055 THOMAS J. RUSK MIDDLE SCHOOL MIDDLE SCHOOL, 8/19/24, 4:00PM, 2929 Inwood road Dallas, TX 76235
BID-DATE & LOCATION:
All Construction Services construction procurements must be physically delivered to the Construction Services
office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas,
TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.
Completed CSP Package Part 1-A, 1-B and 1-C are due on Wednesday, 09/11/2024 at 2:00 PM (local time).
Completed CSP Package Part 2 is due on Thursday, 09/12/2024 at 3:00 PM (local time).
Any materials received after the respective closing dates / times will not be considered.
The District will open and read the names of the proposers and prices submitted in responsive CSPs beginning at
3:00 P.M. local time upon submittal of Part 2 of the Package, via zoom at Dallas ISD Construction Services, Linus
D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231.
No further information will be officially released until after the date the Agenda is publicized for the Board of Trustees
briefing.
Join Zoom Meeting
https://dallasisd.zoom.us/j/83260452328?pwd=mv8uwwnRGk2RG4Saw0pNbQIopHrkB.1
Meeting ID: 832 6045 2328
Passcode: 212937
The right is reserved to reject any or all bids, proposals, CSPs or statements of qualification and to waive
technicalities.
The Dallas Independent School District is committed to the ideals of equal opportunity in all its business endeavors.
The Dallas Independent School District’s Construction Services projects have a 30% Minority and Women-Owned
Business Enterprise (M/WBE) construction goal.
RUN TWO TIMES ONLY AS FOLLOWS:
8/4/2024 and 08/11/2024
OWNER
Dallas ISD Procurement Services c/o Bond/Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 North Central Expressway, Suite 800
Dallas, TX 75231
OWNER’S PROJECT MANAGER (PM):
Joseph Reeves, Project Manager
Dallas Independent School District
Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway, Suite 800
Dallas, TX 75231
Phone: 940-445-7223
E-mail: C100100@dallasisd.org
ARCHITECT/ENGINEER FIRM (A/E)
PGAL, Inc.
14135 Midway Road, Suite G-200
Addison, TX 75001
Main Contact: Tim Konganda
Phone: 214-647-6442
Email: tkonganda@pgal.com
BID METHOD:
Competitive Sealed Proposals