DALLAS ISD - ORG 053 JL LONG MS RENOVATION

COMPETITIVE SEAL PROPOSAL FOR DALLAS ISD - OG 053 J.L. LONG MIDDLE SCHOOL - RENOVATION

Status

Bidding Closed

Prebid Date 2/3/25 10:00am
Bid Date 2/4/25 2:00pm

Company & Contacts

Dallas ISD 2020 Bond Program
Dallas ISD - Procurement Services  
ProcurementCS@dallasisd.org

Location

6116 Reiger Ave, Dallas, TX 75214

All digital files included with purchase of complete printed set via file transfer. Specs separated by section and plans by sheet names.

Half Size Available upon Request

NOTICE: INVITATION TO BID

SCOPE OF WORK:

ORG 53 J.L. LONG MIDDLE SCHOOL- RENOVATION: Project consists of the following:

1. Interior renovation at building entry.
2. Interior renovation at existing gym and provide gym divider curtain.
3. Replace finishes in existing elevator.
4. Replace exterior sealant at windows and control joints.
5. Repair and replace existing windows.
6. Provide exterior light fixtures and lighting controls.
7. Replace / Provide HVAC at existing IDF/MDF rooms.
8. Provide new marquee sign.
9. Partial replacement of existing CTP roof system.
10. Improve drainage at courtyard.
11. Replace select HVAC and RTUs at Auditorium.
12. Replace / Provide water fountains with bottle fillers.
13. Replace RPZ / Backflow Preventors.
14. Repair / Repoint existing stone parapet (Bid Alternate).
15. Replace existing grease trap (Bid Alternate).
16. Repairs / Replace exterior doors and hardware (Bid Alternate).
17. Provide motorized cross-court basketball goals (Bid Alternate).
18. Paint exterior railings and clean exterior facade (Bid Alternate).

PRE-BID-DATE & LOCATION:

A pre-proposal meeting will be held at 6116 Reiger Ave, Dallas, TX 75214 on Monday, 02/03/2025 at 10:00 am via zoom for all interested parties. This meeting is not mandatory, but the information discussed will be extremely helpful in preparation of the proposal.

CSP 207703 Pre-Proposal Meeting (Online)
Monday, February 3, 2025 · 10:00 – 10:30am
Time zone: America/Chicago
Google Meet joining info
Video call link: https://meet.google.com/shq-cyzn-hrb

All general contractors and sub-contractors are encouraged to attend this meeting. Contractors will meet A/E(s) and PM at the school to start site tours. The first site tour will take place immediately following the pre-proposal. The following is the schedule for each site tour:

053 J.L. LONG MIDDLE SCHOOL, 02/03/2025 3:00 PM, 6116 Reiger Ave, Dallas, TX 75214

BID-DATE & LOCATION:

All Construction Services procurements must be physically delivered to the Construction Services office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.

Completed CSP Package Part 1-A, 1-B and 1-C are due on Tuesday, 03/04/2025 at 2:00 PM (local time).

Completed CSP Package Part 2 is due on Wednesday, 03/05/2025 at 3:00 PM (local time).

Any materials received after the respective closing dates / times will not be considered.

The District will open and read the names of the proposers and prices submitted in responsive CSPs beginning at 3:00 P.M. local time upon submittal of Part 2 of the Package, via zoom at Dallas ISD Construction Services, Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231.

CSP 207703 - ORG 053 JL Long MS - Bid Opening
Wednesday, March 5 · 3:00 – 4:00pm
Time zone: America/Chicago
Google Meet joining info
Video call link: https://meet.google.com/iyq-djrs-nkb
Or dial: 2984-714-(US)+1 216 PIN: 123 950 599#

No further information will be officially released until after the date the Agenda is publicized for the Board of Trustees briefing.

The right is reserved to reject any or all bids, proposals, CSPs or statements of qualification and to waive technicalities.

The Dallas Independent School District is committed to the ideals of equal opportunity in all its business endeavors.

The Dallas Independent School District’s Construction Services projects have a 30% Minority and Women-Owned Business Enterprise (M/WBE) construction goal.

RUN TWO TIMES ONLY AS FOLLOWS:
01/19/2025 and 01/26/2025

OWNER:
Dallas Independent School District
Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway Suite 800
Dallas, TX 752311

OWNER’S PROGRAM MANAGER (PM):
Anushree Nayak, Project Manager, Jacobs
Dallas Independent School District
Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway Suite 800
Dallas, TX 75231
Phone: 972-925-7230
E-mail: C117288@dallasisd.org

ARCHITECT/ENGINEER FIRM (A/E):
DLR Group Inc.
2500 Pacific Ave, Suite 1600
Dallas, Texas 75226
Main Contact: Charles E. Brant, AIA
Phone: 214.452.1264
Email: cbrant@dlrgroup.com

BID METHOD:
Competitive Sealed Proposals