DALLAS ISD - ORG 152 - MARGARET B. HENDERSON ES - RENOVATION
Status
Accepting Bids
Prebid Date | 3/4/25 10:00am |
Bid Date | 4/2/25 2:00pm |
Company & Contacts
Location
2200 S. Edgefield Ave. Dallas, TX 75224
All digital files included with purchase of complete printed set via file transfer. Specs separated by section and plans by sheet names.
Half Size Available upon Request
NOTICE: INVITATION TO BID
SCOPE OF WORK:
Org 152 – Margaret B. Henderson Elementary School - Project consists of the following:
1. Exterior window replacement
2. Roof replacement, modified bitumen and standing seam metal roofs
3. Renovation for a new secure vestibule and receptionist
4. Flooring replacement
5. Ceiling and light fixture replacement
6. Refinish millwork and countertops
7. Paint walls
8. Replace hot and cold water supply piping
Total Estimated Construction Budget (CCL + IC+ Allowances) for CSP 207874 $10,217,535.00
PRE-BID-DATE & LOCATION:
A pre-proposal meeting will be held via Google Meet at 10:00 AM on Tuesday March 4, 2025 for all interested parties. This meeting is not mandatory, but information discussed will be extremely helpful in preparation of the proposal.
Google Meet Information:
Meeting ID
meet.google.com/bzf-mnhb-utq
Phone Numbers
(US)+1 608-618-4772
PIN: 528 313 199#
All general contractors and sub-contractors are encouraged to attend this meeting. Contractors will meet A/E(s)
and PM at the school to start site tours. The following is the schedule for each site tour:
Org 152 Margaret B. Henderson Elementary School, March 4, 2025, 3:30 PM, 2200 S. Edgefield Ave. Dallas, TX 75224
BID-DATE & LOCATION:
All Construction Services procurements must be physically delivered to the Construction Services office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.
Completed CSP Package Part 1-A, 1-B and 1-C are due on Wednesday, 4/02/2025 at 2:00 PM (local time).
Completed CSP Package Part 2 is due on Thursday, 4/03/2025 at 3:00 PM (local time).
The District will open and read the names of the proposers and prices submitted in responsive CSPs beginning at 3:00 P.M. local time upon submittal of Part 2 of the Package, via google meet.
Google Meet Information:
Meeting ID
meet.google.com/ybq-jbfw-ccy
Phone Numbers
(US)+1 314-325-4534
PIN: 854 790 189#
No further information will be officially released until after the date the Agenda is publicized for the Board of Trustees briefing.
The right is reserved to reject any or all bids, proposals, CSPs or statements of qualification and to waive technicalities.
The Dallas Independent School District is committed to the ideals of equal opportunity in all its business endeavors.
The Dallas Independent School District’s Construction Services projects have a 30% Minority and Women-Owned Business Enterprise (M/WBE) construction goal.
RUN TWO TIMES ONLY AS FOLLOWS:
2/16/2025 and 2/23/2025
OWNER:
Dallas Independent School District
Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway Suite 800
Dallas, TX 752311
OWNER’S PROGRAM MANAGER (PM):
Zafar Syed, Project Manager
Dallas Independent School District
Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway Suite 800
Dallas, TX 75231
Phone: 972-925-7376
E-mail: C264@dallasisd.org
ARCHITECT/ENGINEER FIRM (A/E):
ORCUTT | WINSLOW
222 W. Las Colinas Blvd #749E
Irving, TX 75039
Main Contact: Brian Harlan
Phone: 817-235-8364 (mobile) 214-396-2090 (office)
Email: harlan.b@owp.com
BID METHOD:
Competitive Sealed Proposals